Village of Tahsis Official Community Plan Update
In the face of that seasonal population growth, the Village of Tahsis recognized that an updated Official Community Plan (OCP) was needed.
In the face of that seasonal population growth, the Village of Tahsis recognized that an updated Official Community Plan (OCP) was needed.
Port McNeill recognized that an updated Official Community Plan (OCP) would establish guidelines for the future of the community.
In 2020, KFN embarked on a multi-year improvement program to help them do their infrastructure management business in a different way.
The next logical step for the BC Powersports Coalition was the development of a best practices guide to inform development in BC.
Because of the Watson Island Redevelopment Project, the Prince Rupert community has witnessed a new beginning for the site of a former pulp mill.
With the Malahat Corridor Improvement Project, the BC Ministry of Transportation & Infrastructure has been improving the safety of Hwy 1 by installing a median barrier and other upgrades. The stretch of highway which runs through Goldstream Provincial Park is challenging to design solutions for, as it is constrained by the river immediately running next to it, and by park lands on both sides.
McElhanney was hired to update View Royal’s sanitary system models to reflect current operating conditions, assess existing system conditions and service life, and prepare a capital plan list to prioritize short- and long-term upgrades.
McElhanney developed six options for Upland’s separate sewer and stormwater systems with service to each residence. The District is focused on eliminating combined system overflows and reducing overall volume to the regional system.
Saanich, BC – The Swan Lake and Brett Road Trestles are former railway trestles located on the Lochside Regional Trail and originally built between 1915 and 1917. Swan Lake Trestle is a 32 span 150m long structure and Brett Road Trestle is a 5-span 30m structure.
Holberg, BC – The Ministry of Transportation and Infrastructure requested McElhanney to perform a safety assessment of the existing bridge site, detailed design of the temporary detour Acrow bridge substructure and the conceptual and detailed design of the replacement bridge, under an As and When Engineering Services Contract. M