Vedder Roundabout

3D Photorealistic renders were required to showcase the design of this roundabout. CAD files were provided to model the roundabout as well as the terrain. After adding textures, lights and 3D models the renders were retouched to produce the final 3D imagery. The Contractor used these renderings to communicate the project to residents and stakeholders.

Bear Creek Bridge Replacement

McElhanney is providing a wide array of services for this project including structural, civil, and hydrological engineering, environmental, visualization, and arborist services. McElhanney developed the images to help illustrate the project concept.

Pine Pass and South Peace Floods

Following severe rain in June 2011, Hwy 97 experienced floods between Pine Pass and 20km south of Chetwynd (a length of 60km), with 73 damaged sites. This flooding resulted in the loss of culverts and bridge end fills, and washouts along various portions of the highway, forcing closure of this vital route.

Pattullo Bridge Deck Rehabilitation

TransLink and the Ministry of Transportation and Infrastructure brought on McElhanney as the prime consultant to address deck repairs and create both a traffic management plan and an operations plan. The result was comprehensive plan that allowed the bridge deck rehabilitation to be completed and re-opened ahead of schedule.

Port Mann Highway 1 Roadworks and Detour Designs

During construction, more than 120,000 vehicles drove over the Port Mann Bridge every day, ranging from commuters (travelling 80km/h) to slow-moving construction machinery. The detour designs needed to incorporate HOV lanes, cycling lanes, and dedicated bus and truck ramps, and ensure high-speed and low-speed traffic did not mix.