San Josef River Bridge No. 7939

Holberg, BC – The Ministry of Transportation and Infrastructure requested McElhanney to perform a safety assessment of the existing bridge site, detailed design of the temporary detour Acrow bridge substructure and the conceptual and detailed design of the replacement bridge, under an As and When Engineering Services Contract. M

Jasper Tramway Upgrades

Jasper Tramway Upgrades 2012 | Jasper SkyTram whisks people to 2300m elevation, providing access to boardwalks and hiking trails to the summit of Whistler’s Mountain. What started out as an upgrade design for the tram’s braking system has turned into a long-term relationship between McElhanney and the owners.

Ironwood & Coppersmith Plazas

Richmond, BC – The Ironwood and Coppersmith shopping plazas are located in Richmond, BC. McElhanney was hired by Westbank to provide 3D building models for architectural design and site plans for the development permit so renovations and upgrades to the building facades and exterior areas could proceed.

Golden Ears Bridge

Golden Ears Bridge 2005-2009 | Maple Ridge, Pitt Meadows, Surrey, and Langley, BC – Prior to 2009, residents and commuters in Langley, Maple Ridge, and Pitt Meadows faced long traffic delays when crossing the Fraser River. At the time, the only options available were the Port Mann Bridge or the Albion Ferry.