Phibbs Transit Exchange Improvements
The upgraded Phibbs Transit Exchange is now home to 13 bus bays supporting 13 bus routes to and from the North Shore.
The upgraded Phibbs Transit Exchange is now home to 13 bus bays supporting 13 bus routes to and from the North Shore.
Lobelia Subdivision and Lobelia Drive Upgrades 202-22 | Osoyoos, BC The Lobelia Subdivision and Lobelia Drive Upgrades marked the conversion of a 3.24-acre family fruit farm, operational since the 1970s, into a thriving 15-lot single-family home community. In the spring of 2018, the Mackay family, who had recently inherited the family farm, faced the dilemma…
There are numerous applications for Trimble SiteVision, from underground utility exploration to aboveground boundary overlays.
With the Malahat Corridor Improvement Project, the BC Ministry of Transportation & Infrastructure has been improving the safety of Hwy 1 by installing a median barrier and other upgrades. The stretch of highway which runs through Goldstream Provincial Park is challenging to design solutions for, as it is constrained by the river immediately running next to it, and by park lands on both sides.
Working closely with the town, McElhanney proposed new designs for these parks that will add a fresh sense of place to the community and give residents spaces where they can relax and reconnect with nature.
The survey work for the intake tower included GPS, 3D laser scanning, UAV, and multi-beam bathymetry. The team used GPS to establish primary control from which to base the survey, and then extended that control network around the site with a conventional total station.
Ross Road is located between Mountain Highway and Allan Road in North Vancouver. McElhanney is designing replacement bridges for the aging Coleman Creek and Hastings Creek Bridges. This involves raising both the roadway approaches and bridges to achieve the maximum freeboard possible.
McElhanney gathered laser scanned data, converted it into a 3D model, then brought it into Virtual Reality software. This is a relatively simple virtual reality experience where the user can move around the station by walking or teleporting.
The 3D visualization for this project needed to show what No. 2 Road would look like after the widening between Steveston Highway and London Road was finished. Our team took photos from 5 specific locations to so the surroundings in the rendering could be accurate.
3D Photorealistic renders were required to showcase the design of this roundabout. CAD files were provided to model the roundabout as well as the terrain. After adding textures, lights and 3D models the renders were retouched to produce the final 3D imagery. The Contractor used these renderings to communicate the project to residents and stakeholders.