Wallace Street Ditch Flood Resiliency Upgrades
Could a long-term flood resiliency upgrade solution protect residents against ditch erosion and slope instability?
Could a long-term flood resiliency upgrade solution protect residents against ditch erosion and slope instability?
Adra Tunnel – Terrestrial LiDAR Scan 2022 | Penticton, BC The Adra Tunnel is part of the Kettle Valley Railway (KVR) corridor that links Myra Canyon above Kelowna to Penticton. The Railway was built over 100 years ago and is considered an Engineering marvel of its time. The Railway was decommissioned in the 1980s and is now…
McElhanney delivered digital engagement services and kept communication channels open without relying on physical meetings.
With the dam set to expire as a sediment pond, RDNO focused on decommissioning the facility and returning the creek to a natural state.
The Big Elbow Trail bridge had suffered irreparable damage and McElhanney was engaged for the structure’s replacement.
The Town of Olds engaged McElhanney for infrastructure assessments including sanitary sewer and water main.
Along with Legacy Tourism Group, McElhanney provided engineering, design, and tourism planning for Kinosoo Ridge Aerial Adventure Park.
McElhanney navigated Canyon Ski Area’s passenger conveyor and T-Bar AEDARSA submissions by making Canyon’s challenge our own.
McElhanney provided Nitehawk Adventure Park bike carrier engineering, a preliminary submission to AEDARSA, and onsite acceptance testing.
Combining over 6km of paved and accessible multi-use trails, the Fernie Valley Pathway is a robust, multi-modal transportation system.