Port Mann Highway 1 Roadworks and Detour Designs
During construction, more than 120,000 vehicles drove over the Port Mann Bridge every day, ranging from commuters (travelling 80km/h) to slow-moving construction machinery. The detour designs needed to incorporate HOV lanes, cycling lanes, and dedicated bus and truck ramps, and ensure high-speed and low-speed traffic did not mix.