Vedder Roundabout

3D Photorealistic renders were required to showcase the design of this roundabout. CAD files were provided to model the roundabout as well as the terrain. After adding textures, lights and 3D models the renders were retouched to produce the final 3D imagery. The Contractor used these renderings to communicate the project to residents and stakeholders.

Waterfront Centre

This Virtual Reality experience shows the potential of this technology and its benefits for project proposals, public forums, marketing, stakeholder engagement, and more. Laser scanned data, CAD models, and 3D models were used along with programming to create this fully immersive experience.

Bear Creek Bridge Replacement

McElhanney is providing a wide array of services for this project including structural, civil, and hydrological engineering, environmental, visualization, and arborist services. McElhanney developed the images to help illustrate the project concept.

Town of High River New Land Use Bylaw

High River, AB – The Town of High River, Alberta, had an outdated set of bylaws which dated back to 1980. McElhanney was retained to re-write the Town’s Land Use Bylaw based entirely on walkability; the first of its find in Alberta.

Pine Pass and South Peace Floods

Following severe rain in June 2011, Hwy 97 experienced floods between Pine Pass and 20km south of Chetwynd (a length of 60km), with 73 damaged sites. This flooding resulted in the loss of culverts and bridge end fills, and washouts along various portions of the highway, forcing closure of this vital route.

Water Management for the Salmon River Dam Decommissioning

During the summer of 2017, BC Hydro’s 60-year old creosote timber dam was completely removed from the Salmon River on Vancouver Island, and the site was re-naturalized. McElhanney designed bypass channels, cofferdams, and river diversion works to use as small a footprint as possible in this narrow and hectic worksite.