San Josef River Bridge No. 7939

Holberg, BC – The Ministry of Transportation and Infrastructure requested McElhanney to perform a safety assessment of the existing bridge site, detailed design of the temporary detour Acrow bridge substructure and the conceptual and detailed design of the replacement bridge, under an As and When Engineering Services Contract. M

Roberts Bank Rail Corridor – Surrey Combo Overpass Project

McElhanney’s component was located within the City of Surrey,City of Langley and Township of Langley between 192nd and 196th Streets, and between the Nicomekl River and 64th Avenue. McElhanney provided design management services, geometrics, traffic analysis, utility relocations, traffic management plan, lightweight fill accommodation with MSE wall designs, railway crossing permits, and construction quality review for roads and bridges.

Progress Energy Asset Management

McElhanney was retained by Progress Energy for the purpose of asset management/inventory. McElhanney split the asset management project into 3 phases; (1) project initiation and development of Vertisee, an online web-based map to sort and file information collected on roads, bridges and other assets; (2) data acquisition and management; and (3) ongoing updates.

Prince Rupert Gas Transmission Project

The Prince Rupert Gas Transmission Project (PRGTP) is a proposed 900 kilometre natural gas pipeline running from Hudson’s Hope to Lelu Island on the BCs North Coast. This project involved extensive digital data collection in the field using the latest technology and continual updates to Vertisee, McElhanney’s own web-based GIS mapping platform.

Parks Canada Campground Concepts & Design Manual

The Parks Canada Campground manual forms the foundation for developmental standard and design guides for existing and new campgrounds. With the original manual created in 1972 and last updated in 1992, Parks Canada needed a new edition for modern visitors. McElhanney was given the opportunity to update and develop the manual to guide the renewal of campgrounds and associated facilities throughout Canada’s national parks.

Mount Lehman Interchange

Mount Lehman Interchange 2004-2006 | Abbotsford was Canada’s fastest growing economy in 2004 according to The Conference Board of Canada. The existing Mt. Lehman Road / TransCanada Highway Interchange was overwhelmed by this rapid growth and the expansion of Abbotsford International Airport.

Jasper Tramway Upgrades

Jasper Tramway Upgrades 2012 | Jasper SkyTram whisks people to 2300m elevation, providing access to boardwalks and hiking trails to the summit of Whistler’s Mountain. What started out as an upgrade design for the tram’s braking system has turned into a long-term relationship between McElhanney and the owners.