Raising of the Bayonne Bridge
The historic raising of the Bayonne Bridge has permitted the largest modern supertankers and shipping vessels vital access to Newark Bay.
The historic raising of the Bayonne Bridge has permitted the largest modern supertankers and shipping vessels vital access to Newark Bay.
McElhanney designed a 21,200m3 stormwater detention system for the Southwest Yorkson neighbouthood of Langley, BC. Due to land constraints, McElhanney proposed a non-traditional solution where the stormwater detention system was installed below sports fields in tanks.
McElhanney was retained to design a brand new road for the Township of Langley, connecting the intersection of Labonte Ave / 216th Street with the intersection of Glover Road / Trinity Western University.
McElhanney was retained to twin the bridge, widen 0.8km of approach roads, and upgrade the multi-use bike path, to improve efficiency, safety, and accessibility for all users.
McElhanney worked alongside Parks Canada to complete several avalanche mitigation projects in the Rogers Pass area of Glacier National Park. This area is a critical link between Alberta and British Columbia, through which the Trans Canada Highway and the Canadian Pacific Railway traverse.
The budget-friendly re-design included a much-needed new bypass around the lift station for emergency or other temporary use. Through intricate design, the team managed to tie it in with existing, unused infrastructure to save the Town added expense.
In 2014 the City of Cold Lake adopted the Kinosoo Beach Master Plan, which McElhanney planners helped the City to create. The project engaged citizens of all ages in the enhancement of one of Cold Lake’s best destinations.
McElhanney is providing a wide array of services for this project including structural, civil, and hydrological engineering, environmental, visualization, and arborist services. McElhanney developed the images to help illustrate the project concept.
In December, 2007 the City of Prince George experienced a rapid cold snap which resulted in an ice jam on the Nechako River. A 66-day long local state of emergency was declared and over 100 residents were evacuated from their homes.
Since 2008, McElhanney has completed over 300 assignments for Parks Canada. This includes emergency response services for major floods in Banff, Jasper, and Kootenay National Parks in 2012 and 2013, as well as avalanche cleanup in Banff National Park in 2017.