Walfred Road Reservoir Valve Upgrade
McElhanney provided design and construction services to provide reservoir valve upgrades at Walfred Reservoir.
McElhanney provided design and construction services to provide reservoir valve upgrades at Walfred Reservoir.
The City of Duncan’s reservoir replacement had to store twice the amount of water on a parcel the size of a basketball court. Could our design deliver?
To support BC MoTI’s Resilient Highway Infrastructure Adaptation Program, we developed a system to identify, analyze, and map at-risk culverts province-wide.
To address an existing water storage deficiency, the City of Armstrong requested a design for concrete potable water reservoirs.
McElhanney led a team of civil, process mechanical, structural, geotechnical, and electrical disciplines in the Wakefield lift station replacement.
Lobelia Subdivision and Lobelia Drive Upgrades 202-22 | Osoyoos, BC The Lobelia Subdivision and Lobelia Drive Upgrades marked the conversion of a 3.24-acre family fruit farm, operational since the 1970s, into a thriving 15-lot single-family home community. In the spring of 2018, the Mackay family, who had recently inherited the family farm, faced the dilemma…
There are numerous applications for Trimble SiteVision, from underground utility exploration to aboveground boundary overlays.
After it was destroyed by wildfire in 2017, McElhanney was engaged to deliver a FireSmart strategy for Crandell Mountain Campground.
McElhanney’s landscape architects incorporated soil cells in the Riley Area’s streetscape improvements to support long-term tree health.
Could a long-term flood resiliency upgrade solution protect residents against ditch erosion and slope instability?